Route: Nariinsukhait–Shiveekhuren
Length: 43.2 km
Width: 16.8 m
Lanes: 3
Paving: Cement-concrete with a thickness of 24 cm, with a frost protection layer of 30 cm, and a bitumen spray and cement-stabilized base layer of 25 cm.
Capacity: Designed to handle up to 150 tons per vehicle, with an annual capacity of 40 million tons of coal.
Safety: Fully ensures safety for heavy-duty vehicles and adheres to international standards.
Completion: The project was successfully completed and handed over to the State Commission in September 2014.